Drains & Sewers

Linear Shower Drain Installation: The Plumbing Side

Northern Benjamin Franklin Plumbing · · 12 min read
Linear Shower Drain Installation: The Plumbing Side

Key Takeaways

  • A linear drain needs a single-slope floor. The whole shower floor tilts in one direction toward the drain.
  • Rough-in depth depends on the drain model. One manufacturer’s guide sets the vertical drainpipe 1-1/4 inches below the top of the subfloor. That is a product figure, not a general rule.
  • Flow rate matters. An entry-mounted linear drain is limited to 5 GPM, while a back-wall drain handles 10 to 12 GPM.
  • Every shower drain needs a trap and a vent. Minnesota Rules require a protecting vent for each fixture trap.
  • Minnesota’s shower lining rule calls for a pitch of 1/4 inch per foot toward the weep holes.
  • Brooklyn Park says the Minnesota Plumbing Code requires a permit for any change to the plumbing system, and showers are on its list.
  • Moving an existing drain is costly. Decide the drain location before you order tile.

The Short Answer

A linear shower drain works when the whole floor tilts one way toward a drain set at the right depth. The plumbing comes first. Before any tile goes down, someone must confirm where the waste line runs. Someone must also confirm how far the floor can be recessed and how the trap and vent connect.

Most guides on linear shower drain installation are written for tile setters. They treat the plumbing as an afterthought. Here, the focus is on what the plumber needs settled first, plus the Minnesota rules that apply.

What does the plumber need settled before the tile setter shows up?

Four things need answers: where the drain sits against the joists and waste line, which way the floor slopes, how high the drain body sits, and whether you have a permit. Settle these before waterproofing starts. Tile is the last layer, and everything under it is hard to change.

Here is what the plumber confirms on site:

  • Waste line location. We find where the existing waste line runs and whether it lines up with the new drain.
  • Floor recess. We check whether the shower floor can drop into the joists, or whether the drain must sit on top of the subfloor.
  • Drain body height. We set the height so the finished floor, the liner, and the grate all line up.
  • Trap and vent. We reconnect the trap and check that the vent protects it.
  • Permit. We confirm what your city requires before any pipe is cut.

Settle this early because a wrong guess gets expensive. A trade guide on linear drain installation says moving an existing drain is “extremely costly.” A bad call at the start becomes a floor teardown later.

Tile setters are skilled at what they do. Their work sits on top of the plumbing. When the plumbing is unsettled, they build on a guess.

Why does a linear drain need a single-slope floor?

A linear drain is a long channel, not a single point. So the whole floor tilts in one direction toward that channel, instead of four ways toward a center. That one plane sends water straight to the drain. It also keeps the rest of the bathroom floor level.

A standard center drain uses a cone-shaped slope, with four planes meeting in the middle. That shape fails with a long channel. The slope must run one way, from the far side of the shower toward the drain.

The same ProRemodeler guide gives a clear example. With an entry drain on concrete or a pan system, slope from back to front. That way the bathroom floor elevation is unaffected. The curbless shower floor tilts down to the drain at the door, and the hallway side stays flat.

The lining pitch is a separate rule

Minnesota has a rule for the lining under the tile. Under Minnesota Rules 4714.0408, “Lining materials shall be pitched 1/4 inch per foot (20.8 mm/m) to weep holes.”

Read that sentence closely. It covers the lining, the waterproof layer under the mortar bed. That layer sends water that gets past the tile toward the weep holes. We do not read it as a slope number for the finished tile surface. For that, follow the drain maker’s instructions and your tile setter’s plan.

Pre-slope before the liner

The trade guide also says to pre-slope the floor before the waterproofing liner goes in. That lets weep water reach the drain’s integrated weep holes. Weep holes are small openings that let water trapped under the tile drain into the waste line.

If the liner sits flat, water can pool in the layer below the tile. Over time that water can lead to mold, soft spots, and leaks. Our post on shower pan leak detection and repair covers what those leaks look like once they appear.

How deep should the rough-in sit?

Depth depends on the drain model, the subfloor, and the joists. One manufacturer’s guide sets the vertical drainpipe 1-1/4 inches below the top of the subfloor when solvent welding. That figure is specific to that product. Read your drain’s instructions before anyone cuts the floor.

The Oatey QuickDrain ShowerLine guide says: “The height of the vertical drainpipe should be 1-¼ in. below the top of the subfloor when solvent welding.” Other drains have other numbers. Don’t carry one brand’s depth over to another brand’s drain.

Recessed or flush on the subfloor?

There are two common setups. Your floor decides which one you get.

  • Recessed into the joists. The shower floor drops between the floor joists. This gives the drain and slope room to work.
  • Flush on the subfloor. If the shower cannot be recessed into the joists, or the floor is concrete, the drain sits at the entry, flush on the subfloor. The trade guide calls for “proper blocking below.”

Older Twin Cities homes can have limited room in the floor framing. Cutting into a joist is a structural matter. If your bathroom sits over a finished ceiling, we also look at what is below before we plan the recess.

The same guide says the subfloor should be “level, clean, and structurally sound.” A weak or wavy subfloor shows up later as a cracked tile line.

Vertical or side-waste outlet

Linear drains come with a vertical outlet or a side-waste outlet. The trade guide notes that side-waste is often preferred because moving an existing drain is so costly. A side-waste outlet lets the drain connect sideways to a waste line that is already in place.

Make this choice before you order. The outlet type changes how the drain body meets the pipe. It also changes how much depth you need.

Does flow rate limit which linear drain you can use?

Yes. An entry-mounted linear drain in a curbless shower is limited to 5 GPM, while a back-wall drain handles 10 to 12 GPM. GPM means gallons per minute. If you plan several shower heads, add up the flow before you pick the drain and its location.

Few tile guides explain this limit. It matters most for multi-head showers. A rain head, a handheld, and body sprays add up fast.

The ProRemodeler guide says large multi-fixture showers can reach 20 GPM. For those, it recommends two linear drains in series. That is a bigger plumbing job than one drain and needs more waste line planning.

Here is how we think about it:

  1. List every shower head and spray in the design.
  2. Check each fixture’s rated flow.
  3. Match the total to a drain that can carry it.
  4. Choose the drain location that suits that rating.

A drain that cannot keep up lets water creep past the channel and onto the bathroom floor. Talk to the plumber before you fall for a fixture package.

Do you have to put a P-trap on a shower drain?

Yes. Every shower drain needs a trap, the curved section of pipe that holds water and blocks sewer gas. Some linear drain bodies include a trap. Others connect to one below the floor. Either way, the trap needs a vent so it drains freely and keeps its water seal.

A trap holds a small plug of water. That water seals the pipe so sewer gas cannot rise into your bathroom. If a trap dries out or loses its seal, you smell it.

Why the vent matters

A trap needs air behind it. Without a vent, draining water can pull the seal out of the trap. You may hear gurgling or smell sewer gas. Our post on gurgling drains and plumbing vent problems explains the signs.

Minnesota Rules 4714.1002 amends section 1002.2 of the Uniform Plumbing Code. Each fixture trap needs a protecting vent within the distance in Table 1002.2. In no case may that distance be “less than two times the diameter of the trap arm.”

The trap arm is the pipe between the trap and the vent. The table of exact distances was not on the page we reviewed, so we are not quoting its numbers. Your plumber measures the run and applies the current table.

A curbless remodel can get tricky here. A new shower location may put the trap far from the old vent, and then the vent may need rework. Plan for that early, not after the floor is closed.

How do you connect a new shower drain to the waste line?

You set the drain body at the right height, connect it to the waste line through a trap, tie in the vent, and make the flange joint watertight. Then you test it before anything covers it. The plumber does this work before the tile setter builds the floor.

Here is the usual order of work:

  1. Confirm the waste line. Find its location and depth. Check that it lines up with the drain.
  2. Set the drain body height. Follow the drain maker’s depth figure and allow for the floor build-up.
  3. Dry fit first. Test the pipe lengths and angles before gluing anything.
  4. Join the pipe. Solvent weld where the drain instructions call for it. Solvent welding is gluing plastic pipe with a chemical cement that fuses the joint.
  5. Connect the trap and vent. Make sure the vent protects the trap.
  6. Test for leaks. Fill and check the joints before the floor is covered.

What Minnesota Rules say about the drain itself

Minnesota Rules 4714.0408 is specific. The shower “shall be provided with an approved flanged floor drain designed to make a watertight joint on the floor.” Also, “An approved type subdrain shall be installed with a shower subpan or lining.”

The subdrain must be “of the type that sets flush with the subbase.” It also “shall have weep holes into the waste line.” The weep holes give the water under the tile a path to the pipe.

The page we read shows “Published Electronically: September 27, 2021.” Codes change. Your inspector applies the edition in force when you pull the permit. A plumber who works in your city every week knows the current version.

If you are adding a new bathroom or moving fixtures, our guide to adding bathroom plumbing rough-in in Minnesota shows how the wider rough-in comes together.

What does “tile in” mean for a shower drain?

A tile-in drain, also called a tile-insert grate, has a recessed channel that holds a strip of your floor tile. The grate then blends into the floor. This is a look and a tile-cutting choice. The body, slope, trap, and vent work the same way as with any linear drain.

Many homeowners pick this style for a clean look. Instead of a metal strip across the floor, you see a line of tile.

For the plumber, the grate type still matters. It changes how the drain sits against the finished floor. Insert grates can be deeper than plain ones. Check the drain maker’s specs for the height the grate needs. Then your plumber and tile setter can agree on the drain body height before rough-in.

Pick the grate style before the drain is set. Changing it later can mean changing the height, and that is a bad surprise once the liner is down.

How do you convert a tub drain to a shower drain?

A tub drain sits in a different spot than a shower drain, and it often has a different trap. A conversion means opening the floor, moving or reworking the drain, and building a new pan or lining. A linear drain adds slope and depth planning. Plan on a permit.

The job is bigger than it looks, for four reasons:

  • The drain location changes. A tub drain sits at one end of the tub. A linear drain sits at the entry or the back wall.
  • The waste line may need to move. If the new drain does not line up, the pipe changes too.
  • The trap and vent need a fresh look. The old arrangement may not suit the new layout.
  • The floor must be rebuilt. The tub area needs a sloped, waterproofed floor.

In many homes, the best access is from below, through a basement ceiling or crawl space. That can keep the damage to finished floors small. Other homes need the floor opened from above.

Our full guide to converting a bathtub to a walk-in shower walks through the rough-in. It also explains how the supply lines change. For a larger bathroom project, see our overview of bathroom remodel plumbing.

Bigger jobs like this are where financing questions come up. Ask us about financing when you request a quote.

Does a linear shower drain job need a permit in Minnesota?

Yes, in Brooklyn Park, and you should expect the same question in your city. Brooklyn Park says the Minnesota Plumbing Code requires a permit for any changes to the plumbing system. It lists showers among the permitted work. Check your own city’s rules before work starts.

The Brooklyn Park permit page states: “The Minnesota Plumbing code requires a plumbing permit for any changes to the plumbing system.” It lists “Sinks, Toilets, Showers” among permitted work. Each city runs its own process, so call your building department.

Who can do the work?

The same page says the Minnesota Plumbing code allows you to do your own plumbing work. There is a condition: “you are homesteading (living in) the home, you may apply for a permit.”

Companies face a different standard. The page says they must have a valid Plumbing Contractor (PC) License on file at the MN Department of Labor and Industry. They must also have a licensed Master Plumber of Record.

When you hire anyone for this work, ask to see the license. Ask who pulls the permit. A permit protects you at resale, and it means a second set of eyes checks the work.

Where do the plumber and tile setter hand off?

The plumber hands off once the drain is set, connected, vented, and leak tested. The tile setter then builds the sloped floor, the liner, and the finish. Both trades should agree on the drain model, slope direction, and heights before either one starts.

A clean handoff looks like this:

  • The drain model is chosen and on site.
  • The slope direction is marked on the floor.
  • The drain body height is set and written down.
  • The joints are tested and dry.
  • The weep holes are clear and open to the waste line.

The Oatey guide rates its linear drain install as “advanced” and says it takes ”≥ 2 days.” That tells you the job takes time, so the handoff needs a plan.

Skip the handoff talk and you get finger-pointing later. If the floor leaks, each trade says the other caused it. A shared plan removes that problem.

What mistakes force a teardown?

Most linear drain failures come from skipped planning, not bad tile. These are the errors to avoid:

  • Wrong slope direction. Water that runs away from the drain pools on the floor.
  • Drain height off. A drain set too high or too low will not meet the finished floor.
  • Blocked weep holes. If mortar or liner plugs them, trapped water has no exit.
  • No vent protection. The trap loses its seal, and the drain gurgles or smells.
  • Drain sized too small. A multi-head shower can outrun a low-flow drain.
  • No permit. The work may need to be opened up later for inspection or at sale.
  • Wrong depth figure. One brand’s depth does not apply to another brand’s drain.

Slow drainage after a remodel is also a sign. If your shower is already draining slowly, start with the basics in our guide to fixing a slow shower drain. A clog is a different problem from a slope problem. A plumber can tell them apart.

Why work with a locally owned Twin Cities plumber?

In a curbless shower, the plumber’s early decisions shape the whole result. You want a team that knows local housing, local permits, and local inspectors. Northern Benjamin Franklin Plumbing is locally owned and operated. We serve homeowners across Minneapolis, St. Paul, and the surrounding suburbs.

We stick to plumbing: drains, waste lines, traps, vents, and fixtures. We coordinate with your tile setter and hand off a drain that is set, vented, and tested.

We also respect your time. Our On-Time Guarantee(R) means we arrive in the window you pick, or we pay you $5 for every minute we are late, up to $300. Or, as we say: “If there is any delay, it’s you we pay!” We back our work with a 100% satisfaction guarantee.

Planning a curbless shower? Call (763) 296-1844 or book online. We will help you settle the slope, depth, trap, vent, and permit before the tile goes down. If you are weighing a larger plumbing project, ask about financing too.

For related drain work, see our drains and sewers services.

Frequently Asked Questions

How long does a linear shower drain install take? +
It depends on the floor and the drain. One manufacturer rates its linear drain guide as advanced and says it takes 2 days or more. Add time if the waste line must move or the floor framing needs changes. A plumber can give you a realistic window after seeing the space.
Can I keep my existing drain location? +
Often yes, and it saves money. One trade guide calls moving an existing drain extremely costly. Many installers choose a side-waste linear drain to work with the current waste line. A plumber should confirm the line location and floor recess before you buy a drain.
Who sets the floor slope, the plumber or the tile setter? +
Both trades share the job. The plumber confirms the waste line, drain height, trap, and vent. The tile setter builds the sloped floor and waterproofing. Agree on the drain model, slope direction, and heights before work starts so each trade builds to the same plan.

Need a technician now?

Book Online (763) 296-1844